
Any Section, Any ColorCustom FRPPultrusion
Custom pultrusion is the production of a fiberglass profile in a cross-section, material or finish that is not in a standard catalog, using a die made for that section. Machs designs and builds the die and runs the profile on its own lines, from a modified standard shape to a fully new section. Send a drawing, a sample or just the application and loads; incomplete details are a fine starting point.
What Can Be Customized
A custom pultrusion can change any of five things: shape, reinforcement, resin, size, and color and surface.
Shape
Round and square tubes, I-beams, channels, angles, T-bars, Z-shapes and complex profiles.
Round Tube
Square Tube
I-Beam
Channel
Angle
T-Bar
Complex Profile- Your SectionZ-shapes and more

Reinforcement
E-glass or S-glass, with carbon fiber or aramid where stiffness matters.
- E-GlassStandard
- S-Glass
- Carbon FiberStiffness
- AramidStiffness

Resin
Polyester, vinyl ester, epoxy or phenolic.
- Polyester
- Vinyl Ester
- Epoxy
- Phenolic
Chosen for
- Chemicals
- Temperature
- Fire Rating
Size
Custom wall thickness and lengths up to 12 m or more.

Color and Surface
Standard colors or RAL/Pantone matching, with a surface finish to suit the job.
- Yellow
- Grey
- Green
- Black
- RAL / Pantone
Surface
- Smooth
- Gritted
- Anti-Static
- UV-Resistant
- Coated
- 01Reinforcement
- E-Glass
- S-Glass
- Carbon Fiber
- Aramid
- 02Resin
- Polyester
- Vinyl Ester
- Epoxy
- Phenolic
- 03Length12m or more
Up to 12 m or more; cut to size.
- 04Wall Thickness
Custom to the design.
- 05Maximum Profile Envelope
Reviewed per profile; send the cross-section for a feasibility check.
- 06Tolerances
Industry-standard dimensional tolerances.
- 07Fire Performance
- ASTM E84
- UL 94
Fire-retardant grades.
- 08Standards
- ASTM
- ISO
- EN
- GB
- Customer Specification
- 09New Die Lead Time3–6weeksOrder3 wk6 wk
Typically 3–6 weeks, depending on profile complexity.
- 10Minimum Order Quantity
- Prototypes
- Small Runs
Quoted per profile; prototypes and small runs accepted.
From Idea to Production Profile
A new profile goes through six stages.
- 01Stage 01
Requirements
Dimensions, application and performance needs, or a drawing or sample.
Brief01 - 02Stage 02
Design Review and Quotation
Engineers review the section and propose material and tooling.
Review02 - 03Stage 03
Die Design and Manufacturing
Machs designs, orders and commissions the pultrusion die.
Typically 3–6 weeks
Tooling03 - 04Stage 04
Prototype and Approval
Sample lengths are produced and visual acceptance standards are agreed.
Samples04 - 05Stage 05
Production and Quality Control
In-process monitoring and lab testing of the run.
Testing05 - 06Stage 06
Finishing and Delivery
Cutting, machining and export packing as ordered.
Delivery06
Start at stage one: send a drawing, a sample or just the application and loads.
Send Your RequirementsWhat to Send for a Quotation
A useful custom pultrusion enquiry includes:
- Cross-SectionDrawing, CAD file or sample01
- Length and Quantity02
- Application and Loads03
- Operating EnvironmentChemicals, temperature and outdoor exposure04
- Fire, Color or Standard RequirementsIf your project has any05
If some of this is unknown, say so; the engineering team will suggest a starting point.

Cutting to size before shipmentFrom Profile to Finished Part
A custom profile does not have to ship as raw stock. Machs can cut it to length, drill and slot it, CNC-machine features, apply surface treatment and supply pre-assembled kits, so the profile arrives ready to install.
- Custom ProfileRaw stock
- Cut to Length
- Drill and Slot
- CNC-Machine Features
- Surface Treatment
- Pre-Assembled Kits
- Ready to Install
FAQ
Questions About Custom Pultrusion
Samples, fiber choices and die lead times for custom pultruded profiles.
Yes. Send the sample or its drawing, together with the application, and Machs will review the section and material.
Yes, where stiffness or weight justifies the cost; E-glass remains the standard choice for most structural sections.
Typically 3–6 weeks, depending on the profile, followed by sample production for approval.

Get a Quote
Discuss Your Project with Machs
Send the cross-section, length, quantity and application, and Machs will reply with a tooling and production quotation.
What you receive
- A design review of your section
- A proposal for material and tooling
- A tooling and production quotation
- New die lead time, typically 3–6 weeks
- Emailinfo@machsfrp.com
- Phone / WhatsApp+86 138 6294 9363
FactoryNo. 28, Longyou Road, Wuyao Town, Rugao City, Jiangsu, China
Request a Tooling Quotation
Tell us about your profile. Fields marked * are required.
Accepted files: PDF, DWG, DXF, STEP, JPG, PNG, up to 10 MB each, max 3 files.








